Resource Planning

Resource Planning for Painting Companies — Teams, Vehicles, Sites

Excel spreadsheets, phone chaos, double bookings. There is a better way.

2+ hrs Planning effort / day
15 min Planning effort / day

What Happens Without Software

Four problems that occur daily in almost every painting company.

2 Teams, 1 Site
Double-booking because the calendar is not up to date. One of the two teams makes a wasted journey.
Materials Missing
Order forgotten, lead time ignored. The job site grinds to a halt.
Route Not Optimised
Team drives 45 minutes instead of 15 because the route was not planned.
Qualifications Ignored
Driver's licence, language, equipment certification — who is allowed to do what is not checked.

What Resource Planning Involves

Four tasks that need to be handled every day.

01
Assign Employees
Who works where tomorrow? Assemble teams, take qualifications into account.
02
Plan Vehicles and Equipment
Vans, scaffolding, spray equipment — everything must be in the right place at the right time.
03
Order Materials on Time
Monitor lead times, check stock levels, trigger orders.
04
Factor in Leave and Sickness
Spot absences immediately, organise cover, reschedule projects.

How Software Solves Scheduling

Four features that make the difference.

Mon
Team A — Facade
Tue
Team A — Facade
Team B — Interior
Wed
Team C — Floor
Team B — Interior
Thu
Team A — Skim
Fri
Team C — Floor
Team A — ETICS
Gantt View
The whole week at a glance. Teams, sites and time slots as colour-coded bars.
Available
Smith, M.
Weber, K.
Site A
Miller, T.
Fisher, L.
Site B
Brown, S.
Drag & Drop Planning
Drag employees onto job sites with the mouse. Reschedule in seconds, not minutes.
Team A → Site Friedberg OK
Miller, T. — On leave! CONFLICT
Van 2 → available OK
Scaffolding — double booked CONFLICT
Conflict Detection
Double bookings, leave conflicts and missing qualifications are flagged immediately.
SITE FRIEDBERG
15 min from Bad Nauheim
SITE BUTZBACH
22 min from Bad Nauheim
SITE FRANKFURT
42 min from Bad Nauheim
Automatic Travel Time Calculation
Distance and travel time per site are calculated. Optimised assignment saves kilometres.

Example Calculation: 25 Employees, 3 Site Managers

How much time and money digital scheduling saves per month.

Without Software
Planning effort per day 2 hrs
Working days per month 22 days
Total per month 44 hrs
With EaseControl
Planning effort per day 15 min
Working days per month 22 days
Total per month 5.5 hrs
Monthly saving
EUR 1,155
38.5 hours x EUR 30/hr site manager cost

Frequently Asked Questions About Scheduling

EaseControl starts from EUR 49/month including scheduling, Gantt planning and conflict detection. No setup fee. 14-day free trial. Questions? Call 06033/4171713.
Most companies are productive within 2 hours. The interface is self-explanatory. Video tutorials and personal support by phone and WhatsApp are also available.
Yes. Employees, job sites and vehicles can be imported via CSV. Our team helps with migration from Excel or other systems — free of charge.
Servers in Germany (Hetzner), GDPR-compliant, DPA included. Encrypted connection (TLS 1.3), regular backups, two-factor authentication.

EaseControl Scheduling Features

Gantt Weekly Plan
Teams, sites and time slots as colour-coded bars. The whole week at a glance.
Team Assignment
Drag employees onto job sites with drag & drop. Qualifications are checked automatically.
Conflict Detection
Double bookings, leave conflicts and missing certifications are flagged immediately.
Vehicle Planning
Assign vans and equipment. Availability, inspection dates and location in view.
Travel Time Calculation
Distance and travel time per site. Teams assigned based on location optimisation.
Leave & Sickness
Absences visible immediately. Automatic warning when understaffed.

Done With Excel Chaos in Scheduling

14 days free. Gantt planning, conflict detection, drag & drop. No credit card.